Central Station Enclosures for Seismic Applications
Source: AMCO Engineering Co.
New! For seismic concerns this new line of enclosures for Seismic Zone 4 applications has been certified to Bellcore requirements
New! For seismic concerns this new line of enclosures for Seismic Zone 4 applications has been certified to Bellcore requirements. This line features a new aesthetic design for vertical enclosures in a variety of heights, widths and depths. AMCO standard accessories can be used in most applications. Choice of 21 AMCO standard colors.
AMCO Engineering Co., 3801 N. Rose St., Schiller Park, IL 60176. Tel: 847-671-6670; Fax: 847-671-9469.